Construction cost in Bangladesh including rod,cement,sand,piling,sanitary

March 5, 2017

Rajuk faq regarding obtaining construction permit

http://cp.rajukdhaka.gov.bd/faq

Rajuk’s online service = Permit / Registration / Re-registration

http://cp.rajukdhaka.gov.bd/

Great site in Bangla about building construction, design and estimate

https://www.facebook.com/Buildingplandesign/

Rod estimate
http://need4engineer.com/blog/1591

Building made easy by Kabir steel

http://www.ksrm.com.bd/images/Home-Building-Made-Easy.pdf

porcha,namjari etc definition

http://need4engineer.com/blog/1652

Building code, painting different process mentioned here:

http://civiltech1.blogspot.com/2016/06/blog-post_13.html

Civil Engineering Study site

https://civil24.wordpress.com/page/8/

Estimate of rod, cemnt, bricks etc in one cubic meter

https://banglalo.wordpress.com/2015/11/05/

Detailed time required for construction in Bangladesh with associated cost from World Bank Survey

http://www.doingbusiness.org/data/exploreeconomies/dhaka/dealing-with-construction-permits

No. Procedure Time to Complete Associated Costs
1 Obtain cadastral survey map from Land Settlement Office

Agency: Land Settlement Office

3 days USD 25
2 Obtain zoning clearance

Agency: Rajuk (Capital Development Authority)

To obtain clearance, BuildCo must present proof of land ownership and the cadastral maps showing the exact site location. An anticorruption drive of the interim government of Bangladesh stemmed from massive violations of building regulations on one hand and collapse of buildings with casualties on the other hand impacted the work of some areas of construction regulation. Obtaining zoning clearance takes on average 2 — 3 months if no bribes are paid, while the time limit by law is 15 days.

45 days no charge
* 3 Obtain soil test report

Agency: Private Company

An external firm is generally hired for conducting a soil test.

24 days BDT 59,500
4 Obtain project clearance from the local authority (Ward Commissioner, Dhaka City Corporation)

Agency: Dhaka City Corporation

To obtain the local authority’s approval, BuildCo must submit an application with the proposed design plans. The approval may take anywhere from 3 to 7 days.

3 days no charge
5 Obtain project clearance from the Environmental Directorate

Agency: Environmental Directorate

The Environmental Directorate of Rajuk issues three types of clearances based on the type of establishment: green (nonpolluting), orange (low polluting), and red (high polluting). For the green category, the environmental clearance is issued for a fee of USD 25.00. If unofficial payments are made, the environmental clearance can be obtained in a week. For other categories, the cost and time to obtain a clearance are higher. To obtain a project clearance, the following documents are required, depending on the environmental category:
• Approval from the Ward Commissioner, Dhaka City Corporation
• Project profile, feasibility report, and drawings
• Land ownership documents
• Cadastral survey map and location map
• Trade license (copy)
• Registration of the Board of Investment (copy)
• EIA/ IEE/ EMP Report
• Fees payable to DOE

Fees by total project cost
USD 0–0.08 million: USD 25.00
USD 0.08 million–0.16 million: USD 50.00
USD 0.16 million–0.8 million: USD 80.00
USD 0.8 million–1.6 million: USD 160.00
USD 1.6 million–32 million: USD 400.00
USD 32 million–80 million: USD 800.00
USD 80-million and above: USD 1,600.00

Renewal fees by total project cost
USD 0–0.08 million: USD 5.00
USD 0.08 million–0.16 million: USD 12.00
USD 0.16 million–0.8 million: USD 20.00
USD 0.8 million–1.6 million: USD 40.00
USD 1.6 million–32 million: USD 125.00
USD 32 million–80 million: USD 250.00
USD 80-million and above: USD 400.00

30 days USD 80
* 6 Obtain fire safety clearance

Agency: Fire Department

15 days BDT 8,000
* 7 Obtain clearance from Dhaka Electricity Supply Co (DESCO)

Agency: Dhaka Electricity Supply Co (DESCO)

BuildCo must obtain the clearance from Dhaka Electricity Supply Co (DESCO) for the electrical plans.

15 days no charge
* 8 Obtain water and sanitation clearance

Agency: Dhaka Water and Sewerage Authority (WASA)

The plumbing plans must be cleared by the relevant agencies.

15 days no charge
9 Request and receive inspection from the City Development Authority (RAJUK)

Agency: City Development Authority (RAJUK)

Before the building permit is issued, the authorized officers must visit the site to ascertain its location according to the drawings and maps. However, with only a handful of officers and a massive number of applications, it is extremely difficult to comply with the original 30-day time limit established by the government. The procedure still takes 2 — 5 months on average.

60 days no charge
10 Obtain project clearance and building permit from the City Development Authority (RAJUK)

Agency: City Development Authority (RAJUK)

The approving panel of the City Development Authority (RAJUK) meets weekly to discuss cases. In early 2007, officials in the Ministry of Works imposed a 30-day time limit on the process. Applicants must obtain all relevants clearances, water, sanitation, electricity and a fire safety clearance certificate before applying for the building permit.
Each agency that provides approval is given a 7-day time limit, but it is generally not complied with.

105 days BDT 30,000
11 Receive random inspection from the City Development Authority (RAJUK)

Agency: City Development Authority (RAJUK)

According to the 2006 National Building Code, Section II, chapter 3, all inspections during construction are carried out by a structural engineer who must sign the certificate of supervision. However, a building officer from the City Development Authority may carry out one random inspection during construction to verify that the work is being done according to the approved plans

1 day no charge
12 Submit notice of completion and obtain the certificate of conformity

Agency: City Development Authority (RAJUK)

According to the 2006 National Building Code, chapter 3, section 3.3.4, the completion notice must be signed by the structural engineer who has supervised the entire construction phase. The notice of completion certifies that the building has been built in compliance with the existing regulations. The authorities may or may not inspect the building. It is only after receipt of this completion notice that the certificate of conformity can be issued.

21 days no charge
13 Request and obtain water and sewerage connection

Agency: Dhaka Water and Sewerage Authority (WASA)

10 days BDT 30,000
* 14 Receive inspection by tax inspector from Dhaka City Corporation upon completion of construction

Agency: Dhaka City Corporation

A tax inspector from the Dhaka City Corporation visits the site to assess the completed building. No appointment is necessary and there are no fees paid. The tax authority then sends the annual tax bill which will arrive 30 days later.

1 day no charge

* Takes place simultaneously with previous procedure.

https://gharbaribd.wordpress.com/2009/07/06/building-materials-price/

It provides a price list which is correct as of 2009. One may adjust to the current price using 5% inflation rate.

http://www.online-dhaka.com/english/0_0_11_0-building-material_en.html

Prominent companies name and location to buy items are mentioned.

Guide price of building materials including cement, rod, pipe, bricks with market location could be found here. However it is not mentioned that whether the price is updated or when it was posted.

http://www.online-dhaka.com/0_0_11_0-building-materia.html

 

Advertisements
Leave a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: